Vancouver Condo Renovations: Strata Rules, Permits and ‘No, You Can’t Move That Wall’
Owning a condo in Vancouver is a bit like sharing a very stylish spaceship with a hundred strangers. You own your unit - but also… not really.
When you decide to renovate, you quickly meet your two new best frenemies: strata bylaws and city permits.
If you’re in a glass tower in Yaletown, a character condo in Mount Pleasant, or a waterfront building in Nanaimo, the rules matter just as much as the tile.
What can you actually change in a Vancouver condo?
Short answer: more than you think, but less than you want.
Typically fair game (with proper approvals):
Cabinets, counters, and non-structural walls
Flooring (with acoustic and strata requirements)
Lighting, plugs, and some electrical upgrades
Plumbing fixtures (within limits)
Big red-flag items:
Structural walls (you can’t assume any wall is safe to remove)
Shared mechanical systems (stacks, risers, gas lines)
Building envelope (windows, exterior doors, anything that touches outside)
A good condo reno starts with your strata bylaws and renovation rules.
Photos Source: Pinterest.com
What work usually needs strata approval?
If it makes noise, mess, or touches plumbing/electrical, assume strata wants to know.
Common items that need written approval:
Replacing flooring (especially if you’re going from carpet to hard surface)
Any plumbing changes: moving sinks, adding laundry, reconfiguring bathrooms
Electrical work beyond swapping fixtures
Wall changes: removing, moving, or adding walls or bulkheads
Window coverings that affect the exterior look
Most buildings in Vancouver and on the Island will ask for:
A detailed scope of work
Floor plans (existing + proposed)
Proof of insurance from your contractor
Work schedule and expected duration
Contractor license details
Strata is basically asking: “Will this disturb the building, break anything, or make the lobby dusty for a month?”
When do you need a City of Vancouver permit for a condo renovation?
You’re usually into permit territory if you are:
Moving or adding plumbing fixtures
Making significant electrical changes
Touching anything structural
Reconfiguring room layouts or adding/removing walls
Even if you’re only working inside your unit, the City still cares. Other municipalities (Victoria, Nanaimo, etc.) have similar rules with their own flavor, but the themes are the same: if life safety or building systems are involved, get a permit.
Your designer or contractor should:
Flag when permits are required
Help prepare drawings
Coordinate with engineers if needed
Handle submissions and inspections
If someone insists you “don’t need a permit” for a full bathroom and kitchen overhaul in a concrete tower… that’s a no.
Why do strata and city rules feel so strict?
Because in a condo, your choices can literally affect:
Your neighbours’ sound levels (flooring, wall removal)
The building’s moisture control (plumbing, ventilation, waterproofing)
Fire safety (electrical, sprinklers, exits)
Future resale and insurance coverage
Vancouver and Vancouver Island buildings have extra fun layers like:
High rainfall and humidity → more risk if waterproofing is sloppy
Older building stock in certain neighbourhoods → mystery conditions in walls
Short construction windows due to noise bylaws and strata rules
The rules exist so someone on Level 8 doesn’t flood Level 3 trying to DIY a new shower.
How do I plan a Vancouver condo reno without fighting my strata?
You don’t have to be “that owner” everyone talks about in the AGM minutes.
A smoother approach:
Read the bylaws and renovation rules first.
Boring? Yes. Necessary? Also yes.Involve strata early.
Ask for any renovation guideline documents.
Clarify work hours, elevator booking, and noise rules.
Choose pros who know condos.
Ask to see past condo projects in similar buildings.
Make sure they’re comfortable coordinating with strata and property management.
Present a clean package.
Scope of work
Drawings
Insurance and licenses
Schedule
Buildings say yes faster when they feel like the adults are in charge.
Photo Source: Pinterest.com
FAQ
Q1: Can I renovate my Vancouver condo without telling strata?
Technically, maybe. Practically and legally, very bad idea. If something goes wrong - flood, fire, noise complaints - you can be forced to undo work, pay fines, or have insurance issues. Always follow the process.
Q2: Who applies for permits - me or my contractor?
Usually, your contractor or designer prepares and submits permit drawings, but the owner is still ultimately responsible. Make sure you know what’s being submitted in your name.
Q3: Do cosmetic changes need approval (paint, swapping cabinet doors)?
Often, purely cosmetic interior changes like paint don’t require formal approval, but flooring, lighting, and anything involving plumbing/electrical usually do. Always check your building’s specific rules; “it’s just cosmetic” won’t win an argument at a council meeting.
Final Thought
Condo renovations in Vancouver and on Vancouver Island aren’t just about pretty finishes - they’re about playing nicely with the building’s systems and rules. When you respect the strata and the permit process, you end up with a space you love and neighbours who still say hi in the elevator.
Ready to explore your own condo project? Check out our interior design services for design, planning and full-scope project support.

